Completed Projects
Adani Power 1,600MW Adani Thermal Power Plant Godda,(Jharkhand)
RVNL JOKA METRO DEPOT (METRO CORRIDOR-JOKA-BBD BAGHCORRIDOR) Kolkata, West Bengal.
Britannia biscuit plant under KEC International Ltd.- Building, road, drainage, foundation, fencing and other construction work, etc.at Bihta in Bihar.
Amrapali Group. ( At Amrapali Golf Home in Sector-4 noida Extension,Greater Noida Civil work done like 2, 2.5, 3 BHK Apartments)
Tata Power Solar Ltd. Work details 250MW piling Work, Main Control Room, Distribution Transformer foundation, Inverter Yard station at N.P.Kunta, Andhra Pradesh.
Tata Power Renewable Energy Limited, work details 50MW Piling work at Pavagada, Karnataka.
Adani Solar Energy Pvt. Ltd. Work details 30MW Switch Yard, Main Control Room, Distribution Transformer foundation, pilling work 30MW, MMS work 30MW and all civil work like Road and Drain at Pavagada, Karnataka.
Adani Solar Energy Pvt. Ltd. Work details 20MW Switch Yard, Main Control Room, Distribution Transformer foundation, pilling work 20MW, MMS work 20MW and all civil work like Raod and Drain at Vill-Kalkere, Periyapatana, Mysore, Karnataka- 571108.
Adani Solar Energy PVT LTD. structure & Piling 72 MW, MADURAI TAMILNADU
Susten Mahendra erection ofstructure & Piling 15 MW for sun edition ghattu,Raichur, dist Mahabubnagar, telangana
Susten Mahendra Civil work 45 MW for sun edision ghattu, Raichur, distMahabubnagar, telangana
Welspun Solar Energy PVt. Ltd. 25 MW of 25 MW one erection of structureof25MW and 25 MW Switch Yard , Main Control Room, Distribution Transformer foundation, pilling work 25MW, MMS work 25MW
Welspun Solar Energy PVt. Ltd. 25 MW of erection of structure & PilingatKarnataka.
Welspun Solar Energy PVt. Ltd. (Village- Iyermalai, Talak- Kuditalai, Dist,Tirchipally Done erection of structure of 15 MW.
Welspun Solar Energy PVt. Ltd, (Vill-Padaliya, Tehsil- Jawad, DistNeemuch (M.P) done erection of structure and Module of 25MW.
LANCO Solar Energy Private Limited (village –Shiva Jee Nagar Talku Sakri Distt. Dulia,Maharastra ) Mahagenco Project done erection of structure and Module, 22MW with Pilling.
JP Private Limited (Hydro project), Purni, MadhyaPradesh. Completed mechanical, civil and work structure.
LANCO Solar Energy Private Limited, Askandra, Rajasthan (done erection of structure and Module and Pilling work), 10 MW
LANCO Solar Energy Private Limited, Charnka, Gujarat (done erection of structure and Modules), 10 MW
Civil Work for ERA INFRASTURE. BHUJ
Civil and Electrical Work in SR INDUSTRIES